Monitored new bridge with millimetre precision
Cautus Geo sensor monitored the Seut bridge from February 2018. Before and after the opening of the bridge, real-time data is collected in Cautus Web.
Problem statement
The ground conditions at Seut outside Fredrikstad are very demanding with quick clay, moraine and silt. The Norwegian Public Roads Administration wanted to have control when the new bridge was built, both during the construction work and after the bridge was taken into use.
Solution
The instrumentation was extensive. Sensors captured the curing process, temperature, compressive loads, settlements and lateral movements in real time, displayed in Cautus Web and established with automatic alerts.
The instrumentation on the new Seut Bridge was extensive. Cautus Geo installed 24 strain gauges and one inclinometer on one of the five piles supporting the bridge. In addition, Cautus Geo installed two strain gauges on the girders on both sides.
The sensors captured the curing process, temperature, pressure load, settlements and lateral movements.
Displayed load in 3D
Cautus Geo established a 3D view on a main pile. It visually showed what actually happened when the bridge was exposed to load.
The system showed exactly what happens to the bridge when it is exposed to traffic and was set up with automatic notification to the Norwegian Public Roads Administration.
An alert could be triggered if the bridge moved as much as a millimetre.
Customer
Norwegian Public Roads Administration
Year
2018 - 2022
Location
Fredrikstad
Application area
Technology
The Cautus Geo system provides actual knowledge and a better basis for following up the bridge after it is in normal use.
Tore Veum, project manager at the Norwegian Public Roads Administration
Contact person
Switchboard telephone +47 990 96 580 or e-mail salg@cautusgeo.com